Section 4 - Policies

Engineering Director

Thomas V. Clabo, P.E.
[email protected]
(865) 215-2148

400 Main St., Suite 475
P.O. Box 1631
Knoxville, TN 37901

Last item for navigation
  • Share on Facebook
  • Share on Twitter
  • Share via Email

SECTION 4 -POLICIES

Administrative

Appealed Concept or Use-On-Review Plan [PDF] Revised March 2006
Covenants - CPMSF (permanent maintenance agreement) [PDF] Revised June 2003
Declaration Document Process [PDF] Revised October 2022
Performance and Indemnity Agreements (Bonds) [PDF] Revised July 2014
Permit Application Process [PDF] Revised October 2022
Stormwater Easements [PDF] Revised October 2022
Survey Control System Requirements [PDF] Revised October 2022

Grading and Erosion Controls

Qualified Local Program Construction General Permit [PDF] Revised January 2018
Retaining Walls [PDF] Revised February 2022

Maintenance (Post-Contruction)

Creek Restoration and Channel Maintenance [PDF] Revised June 2003
Maintenance Responsibility for Stormwater Drainage Systems [PDF] Revised June 2015
Sediment Disposal for Detention Basin Maintenance [PDF] Revised June 2003
Underground Stormwater Facility Maintenance [PDF] Revised June 2003
Underground Stormwater Facility Recordkeeping / Reporting [PDF] Revised June 2003

Stormwater

List of Studied Streams [PDF] Revised June 2003
No-Rise Certification for Fill Line Area Encroachment [PDF] Revised October 2022
No-Rise Certification for Floodway Encroachment [PDF] Revised October 2022
Post-Construction Water Quality Control for Proprietary Flow-Through Best Management Practices (BMPs) Revised April 2019
Sinkhole Development [PDF] Revised June 2006
Stormwater Enforcement Response Plan [PDF] Revised June 2012
Stormwater Message for Curb Irons and Manhole Lids [PDF] Revised June 2006
Stormwater Pipe Materials [PDF] Revised January 2018

Transportation and Utilities

Access Control for Traffic and Driveways [PDF] Revised February 2002
Permits for Utility Construction [PDF] Revised October 2022
Permits for Utility Maintenance [PDF] Revised October 2022
Sidewalk Construction and Maintenance [PDF] Revised October 2022
Street Lighting and Overhead Wiring in the Central Business Improvement District (CBID) [PDF]
Temporary Traffic Control Permit [PDF] Revised October 2022
Utility Access Driveways [PDF] Revised September 2016
Utility Construction in the Right-of-Way [PDF] Revised October 2022