Best Management Practices (BMP) Manual

Engineering Director

Thomas V. Clabo, P.E.
[email protected]
(865) 215-2148

400 Main St., Suite 475
Knoxville, TN 37902

Last item for navigation
  • Share on Facebook
  • Share on Twitter
  • Share via Email
This manual provides standards for the design and implementation of measures to prevent and control erosion, sediment, and other forms of stormwater pollution and is intended to assist developers, engineers, contractors, inspectors, and property owners in the selection and use of Best Management Practices (BMPs) for the design of new facilities. 




MAIN TEXT


Introduction [PDF]
     Abbreviations and Acronyms [PDF]
     Glossary [PDF]
Erosion and Sediment Control [PDF]
Stormwater Pollutants [PDF]
Selecting BMPs [PDF]
Erosion and Sediment Control Plan [PDF]
Stormwater Pollution Prevention Plan [PDF]
Special Pollution Abatement Permit [PDF]

Acknowledgments [PDF]
Related Websites [PDF]
References [PDF]





ACTIVITIES AND METHODS (AM)


These BMPs are applicable to all types of land uses and focus on good housekeeping measures that reduce or eliminate stormwater pollutants. 

BMP # Title
AM-01 [PDF] Employee Training
AM-01 TAB [PDF] Table - Quick Reference for Disposal Alternatives
AM-02 [PDF] Construction Scheduling
AM-03 [PDF] Preservation of Existing Vegetation
AM-04 [PDF] Maintenance of Existing Drainage Systems
AM-05 [PDF] Storm Drainage System Flushing
AM-06 [PDF] Material Delivery and Storage
AM-07 [PDF] Spill Prevention and Control
AM-07 TAB [PDF] Table - Emergency and Regulatory Contacts
AM-08 [PDF] Waste Management and Recycling
AM-09 [PDF] Sanitary and Septic Waste Management
AM-10 [PDF] Contaminated Soil Management
AM-11 [PDF] Dust Control
AM-12 [PDF] Dewatering Operations
AM-13 [PDF] Pesticide, Herbicide, and Fertilizer Use
AM-14 [PDF] Vehicle and Equipment Cleaning
AM-15 [PDF] Vehicle and Equipment Fueling
AM-16 [PDF] Vehicle and Equipment Maintenance
AM-17 [PDF] Paving Operations
AM-18 [PDF] Concrete Waste Management
AM-19 [PDF] Structure Construction and Painting





EROSION AND SEDIMENT (ES)


BMP # Title
ES-01 [PDF] Stabilized Construction Entrance
ES-02 [PDF] Tire Washrack
ES-03 [PDF] Construction Road Stabilization
ES-04 [PDF] Gradient Terraces
ES-05 [PDF] Surface Roughening
ES-06 [PDF] Topsoil
ES-07 [PDF] Mulch
ES-08 [PDF] Seeding
ES-09 [PDF] Sodding
ES-10 [PDF] Trees, Shrubs, and Vines
ES-10 TAB [PDF] Table - Tree Species Suggested for Planting
ES-11 [PDF] Erosion Control Matting
ES-12 [PDF] Geotextiles
ES-13 [PDF] Check Dams
ES-14 [PDF] Silt Fence
ES-15 [PDF] Straw Bale Barrier
ES-16 [PDF] Sandbag Barrier
ES-17 [PDF] Brush or Rock Filter Berm
ES-18 [PDF] Temporary Sediment Trap
ES-19 [PDF] Sediment Basin
ES-20 [PDF] Bank Stabilization and Soil Bioengineering
ES-21 [PDF] Diversions and Swales
ES-22 [PDF] Channel Linings
ES-23 [PDF] Riprap
ES-24 [PDF] Temporary Inlet Protection
ES-25 [PDF] Outlet Protection
ES-26 [PDF] Level Spreader
ES-27 [PDF] Floating Sediment Curtain
ES-28 [PDF] Gabions
ES-29 [PDF] TDOT Standard Details for Erosion Control
ES-30 [PDF] TDEC Erosion and Sediment Control BMPs





INDUSTRIAL AND COMMERICAL (IC)


These BMPs are applicable to sites where material handling and large-scale maintenance occur. They also apply to residential and commercial properties.

The BMPs listed in Section 2 – Activities and Methods, are useful for eliminating or reducing pollution generation and appropriate for these uses.

BMP # Title
IC-01 [PDF] Non-Stormwater Discharges to Storm Drains
IC-02 [PDF] Outdoor Loading and Unloading of Materials
IC-03 [PDF] Outdoor Container Storage of Liquid Materials
IC-04 [PDF] Outdoor Process Equipment Operations
IC-05 [PDF] Grounds Construction and Maintenance
IC-06 [PDF] Over-Water Operations
IC-07 [PDF] Food Service and Handling
IC-08 [PDF] Power or Pressure Washing
IC-09 [PDF] Swimming Pools and Spas
IC-10 [PDF] Dumpsters
IC-11 [PDF] Kitchen Exhaust Cleaning
IC-12 [PDF] Air Conditioners and Refrigeration
IC-13 [PDF] Farms and Agricultural Land
IC-14 [PDF] Response to Sanitary Sewer Overflows
IC-15 [PDF] Mobile Food Service Operations





RESIDENTIAL AND HOMEOWNER (RH)


These BMPs are applicable to residential properties.

BMP # Title
RH-01 [PDF] Non-Stormwater Discharges to Storm Drains
RH-02 [PDF] Vehicle Washing
RH-03 [PDF] Vehicle Maintenance and Repairs
RH-04 [PDF] Landscape Irrigation and Lawn Watering
RH-05 [PDF] Pesticides and Fertilizers
RH-06 [PDF] Household Hazardous Waste
RH-07 [PDF] Sanitary Sewer Laterals and Septic Tanks
RH-08 [PDF] Pet and Animal Wastes
RH-09 [PDF] Slope and Streambank Stabilization
RH-10 [PDF] Swimming Pools and Spas
RH-11 [PDF] Boating and Marinas
RH-12 [PDF] Tips for Wet Basements and Crawl Spaces




STORMWATER TREATMENT (ST)


These BMPs represent permanent stormwater treatment for both stormwater quantity and stormwater quality objectives.

BMP # Title
ST-01 [PDF] Dry Detention Basin
ST-02 [PDF] Wet Detention Basin
ST-03 [PDF] Infiltration Systems
ST-04 [PDF] Constructed Wetlands
ST-05 [PDF] Filter Strips and Swales
ST-06 [PDF] Water Quality Inlets & Media Filtration Inlets
ST-07 [PDF] Oil / Water Separator
ST-09 [PDF] Multiple Systems
ST-10 [PDF] Detention Computations
ST-11 [PDF] Detention Example for Spreadsheet
ST-12 [PDF] Detention Example for HEC-1 and HEC-HMS
ST-13 [PDF] Other Hydrologic Computations





TREE PRESERVATION AND MAINTENANCE (TP)


These BMPs represent permanent stormwater treatment for both stormwater quantity and stormwater quality objectives.

BMP # Title
TP-01 [PDF] Tree Preservation and Maintenance
TP-02 [PDF] Tree Protection Fencing
TP-03 [PDF] Root Pruning
TP-04 [PDF] Tree Planting and Staking
TP-05 [PDF] Selected Tree Species for Planting


For additional information, please see the City of Knoxville Urban Forestry webpage.