Plans Review

Engineering Director

Thomas V. Clabo, P.E.
[email protected]
(865) 215-2148

400 Main St., Suite 475
Knoxville, TN 37902

Last item for navigation
  • Share on Facebook
  • Share on Twitter
  • Share via Email
The Stormwater Engineering Division is part of the plans review process for any development, grading, and construction within the City of Knoxville. All work that disturbs land requires a site development permit.  Permits can be obtained through the Development Services front desk at the City County Building, Suite 475.


Land disturbance contacts, listed below, may be reached at (865) 215-2148.

Plans Review and Design Questions -
Commercial: Martin Pleasant, Kahale Martinez, Jody Dykes, Austin Boswell
Residential: Linda Pierucci

Drainage and Stormwater System Maintenance - David Hagerman

Plat review and Easements - Charlotte Goforth, Vicky Harrell or Ben Davidson

Field Inspections & Development Certification - Aaron Kline

Construction Bonds & Covenants - Susan Nelson