Temporary Closure of South Gay Street Scheduled Mar. 17-18, 2019

Mayor

Indya Kincannon
[email protected]
(865) 215-2040

400 Main St., Room 691
Knoxville, TN 37902

Last item for navigation
  • Share on Facebook
  • Share on Twitter
  • Share via Email
News item

Temporary Closure of South Gay Street Scheduled Mar. 17-18, 2019

Posted: 03/12/2019
As part of the downtown redevelopment of the new Embassy Suites Hotel, 507 South Gay Street, parts of several downtown streets will be temporarily closed Sunday, March 17, at 2 a.m. and will reopen Monday, March 18, no later than 6 p.m.

A large crane will be temporarily erected in front of the Embassy Suites building as part of the construction and renovation. The crane will be dismantled and removed Monday.

The following streets will be temporarily closed:

• Gay Street will be closed at Union Avenue, south to Clinch Avenue.
• Union Avenue will be closed from Walnut Street to Gay Street.
• Market Street will be closed from Union Avenue to Clinch Avenue.

Signs for vehicle and pedestrian traffic will be placed appropriately at 2 a.m., Sunday. Only one sidewalk will be closed and is located on the west side of Gay Street at the Embassy Suites building between Union and Clinch avenues.

The William F. Conley Building, a 13-story, 154,000-square-foot condo and office building, is being transformed into an Embassy Suites. The mixed-use hotel will include an anchor restaurant on the corner of Union Avenue and Gay Street with 160 hotel units above. The hotel is expected to open in late fall 2019.