KUB and its contractor have closed the following sections of roadway, effective immediately, Tuesday, December 15, through 6 p.m., Friday, December 18, as work continues on the Downtown Century II Utilities upgrade project:
• Strong Street between Union Avenue and Clinch Avenue. No pedestrian traffic allowed on Strong Street, or in the area of Krutch Park near the work zone.
• Clinch Avenue between S. Gay Street and Market Street
Follow up advisories will be issued as necessary.
KUB and its contractor will make every effort to reopen at least one lane of traffic in construction zones on weekends and holidays, construction conditions and safety permitting.
Some listed closures may extend beyond the scheduled times depending on the conditions encountered during excavation and construction. Appropriate traffic control measures will be in place at each location to assist motorists traveling in these areas. Due to the ongoing presence of workers and equipment, motorists are advised to use caution and expect temporary delays in these areas.
More information on this and other KUB construction projects can be found at
www.kub.org.